Platform Size:M Warwick Farm at New South
Pay in 4 interest-free payments of $25.00 Learn more
Shipping Estimate
USA
- USA
- CAN
- USA
- CAN
Ships within 48 hours · Estimated delivery Aug 3 - Aug 8
Live Spec
Platform Size:M Warwick Farm at New SouthThe 88 metre platform at Bombala Railway Station stretches away under a corrugated iron awning, weeds forcing through cracks in the concrete. Operated by NSW Government Railways from 21 November 1921, this was the terminus of the Goulburn Bombala branch line, the final stop of a network that took 37 years to push south across the Monaro tablelands. The station closed on 26 March 1986. Part of the Bombala Station series.
Store: jftbasic.com · Domain: jftbasic.com

























