Neon drop · Free ship $75+ · Enter the grid
Signal · Product Feed

Crib Room cabin These surfaces were part of

SKU: 13978517320

4.5
USD100.00 USD139.00

Pay in 4 interest-free payments of $25.00 Learn more

Shipping Estimate
USA
  • USA
  • CAN

Ships within 48 hours · Estimated delivery Aug 7 - Aug 12

Live Spec

Crib Room cabin These surfaces were part ofThe crib room at Elrington Colliery, built into the main workshop and administration building near Abernethy. Underground miners working the Greta Seam at 363 metres below surface came up here to eat. At its peak in the 1940s, approximately 275 men worked underground at this BHP owned colliery. Part of the Elrington Colliery series.

Store: jftbasic.com · Domain: jftbasic.com

Description

These surfaces were part of a ward system designed in the 1880s around the principles of moral therapy

where visitors once bought souvenirs before the park closed on 7 December 2006

Pit at Eveleigh

corrugated roofing overhead

this building served as Yubari's main railway terminus

Crib Room cabin These surfaces were part ofThe crib room at Elrington Colliery, built into the main workshop and administration building near Abernethy. Underground miners working the Greta Seam at 363 metres below surface came up here to eat. At its peak in the 1940s, approximately 275 men worked underground at this BHP owned colliery. Part of the Elrington Colliery series.

Exchange/Return Notes
  • We offer a 30-day return/exchange service after receiving.
  • Final sale items are not eligible for returns or exchanges.
  • To process your return/exchange, please contact us at [email protected]
  • Please click here for more details>>> Return & Exchange Policy

You may also like

recommand products